THE KEEL LAYING OF POINTE DE CAUX WAS CONDUCTED SUCCESSFULLY


 

The Keel Laying of Pointe de Caux, a 4,700 Dwt Product/Chemical tanker, being built for Sogestran Shipping (Hull Nr.123) has been performed successfully on 25th of August 2021, in accordance with the production calendar and with the participation of the Owners. The Construction schedule of the Ship is continuing as planned.
9/1/2021