2019
RMK MARINE has delivered T.Elinor successfully
RMK MARINE has delivered T.Elinor to its distinguished client DİTAŞ A.Ş., on December 18th, 2019 by fulfilling all contractual requirements successfully.
12/26/2019
RMK MARINE HAS LAUNCHED T.DAMLA-9 SUCCESSFULLY
RMK MARINE has launched T.DAMLA-9 Tugboat successfully on 20th of December 2019.
12/20/2019
RMK MARINE Has Delivered COSIMA PG Successfully
RMK MARINE has delivered COSIMA PG successfully, as the third vessel of its distinguished long term client Pritchard Gordon Tankers (PGT) Ltd on 20th November 2019.
11/25/2019
RMK MARINE HAS LAUNCHED T.DAMLA-8 SUCCESSFULLY
RMK MARINE has launched T.DAMLA-8 successfully on 18th of October 2019.
10/23/2019
RMK MARINE has launched COSIMA PG successfully
RMK MARINE has launched COSIMA PG successfully by a ceremony conducted on 12th June 2019.
6/13/2019
Cosima PG Ready For Launching
Cosima PG (NB116) is on the slipway and waiting her launching shortly.
5/31/2019
RMK MARINE has delivered T.ADALYN successfully
RMK MARINE has delivered T.Adalyn to its distinguished client DİTAŞ A.Ş., on May 28th, 2019 by fulfilling all contractual requirements successfully.
5/29/2019
THE VISIT OF THE DUTCH TRADE MISSION TO RMK MARINE
The Dutch Trade Mission led by Mr. Bart van Bolhuis, Council General of the Netherlands in Istanbul paid a visit to RMK MARINE Shipyard on Wednesday, 3rd of April, 2019.
4/9/2019
RMK MARINE HAS LAUNCHED T.ELINOR SUCCESSFULLY
RMK MARINE has launched T.ELINOR.successfully by a ceremony conducted on 28th of March 2019.
3/29/2019
THE FIRST STEEL CUTTING OF NB117
The first steel cutting activity of 70t Bollard Pull Tug Boat (Hull Number NB 117) to be built for a local client was performed on 15 January 2019, as planned according to the contractual building schedule.
1/15/2019